Dispatch software for solar owners

Solar dispatch software

Your electrician turns up to a roof where the racking is not finished, and that is a day of two trades gone. Smarfle has each crew sign their stage off from the property, so whoever comes next is released by what happened and not by what was expected.

7 days free · No credit card · Built in Florida

Smarfle · Solar Dispatch Board
Scheduled2

Service call · 123 Oak St

Mike10:00 AM

Install · 451 Maple Dr

Sara11:30 AM
In Progress1

Repair · 88 Pine Ave

CarlosNow
Completed2

Service · 22 Birch Ln

MikeDone

Tune-up · 17 Cedar Ct

SaraDone
Live map · drag to reassignRoute optimized · saves 47 min

Real Smarfle UI · Live data from your solar CRM

Why generic dispatch software fails solar owners

Generic dispatch tools weren’t built for solar. Smarfle was.

Generic dispatch software

What everyone else gives you

  • Roof crew and electrician are scheduled by two people
  • Nobody knows whether the array is actually mounted
  • A failed inspection is communicated by email the next day
  • Commissioning is arranged after somebody notices it is due

Smarfle for solar

Built for your actual workflow

  • Both sit on one board in the right sequence
  • Each stage is marked complete in the field
  • It is recorded on the job the moment it happens
  • The dependency is visible on the board
Step-by-step

How solar dispatch works in Smarfle

From the first touch to the closed loop. No missing pieces.

  1. 1

    The week before, three crews are sequenced

    Roof, electrical and commissioning are placed in order against one property.

  2. 2

    Day one, mounting closes out on site

    The roof crew marks it done and photographs it, which is what releases the electrician.

  3. 3

    Day three, the electrician arrives to finished mounting

    Because the previous stage was closed in the field, nobody is sent to a job that is not ready.

  4. 4

    When an inspector fails the array

    The reason goes on the record within the hour, not in an email somebody reads tomorrow.

  5. 5

    On commissioning day

    The system goes live and the job closes, releasing the crew capacity it was holding.

Where solar dispatch breaks down

The friction every solar owner recognizes.

✕

The electrician arrives to unfinished racking

Stage completion is reported verbally, so the next trade is sent on an assumption.

✕

A failed inspection reaches the office by email

A day is lost before anybody who could act on it knows it happened.

✕

Three crews are coordinated by three phone calls

Roof, electrical and commissioning each have their own conversation, and none of them share a view.

The math for solar owners

Roof crew, electrician, inspector

Three different skill sets have to hit the same property in the right order over about a fortnight. Ninety installs a year is two hundred and seventy visits that each depend on the one before being genuinely finished.

90

Installs a year

3

Visits each

270

Dependent visits

Based on typical solar operations. Your numbers may vary.

Solar dispatch software questions

Stages are dated on the job and closed out in the field, so you can see whether the next crew should go. The system does not block them.
Yes, as its own dated item with the work that has to precede it.
Yes, attached to the job as the work happens.
No. There is no inverter or monitoring integration.
Through fields you define, yes. There is no asset register per panel.

Moving your solar dispatch software off another tool?

Most solar businesses arrive at Smarfle from one of the tools below. See a side-by-side comparison.

Try solar dispatch software free

7 days to test the full platform with your real solar workflow. No credit card.

Start Free Trial